Application Type
Patent
Application SubType
PCT National Phase
(10) Registration Number and Date
BNN20220083 29.09.2022
Status
Registered
(180) Expiration Date
(20) Filing Number and Date
BN N/2022/0083 11.02.2020
(40) Publication Number and Date
BN N/2022/0083
A
29.09.2022
(86) PCT Filing Number and Date
(87) PCT Publication Number and Date
(85) National Entry Date
(30) Priority Details
US 16/776,298
29.01.2020
(51) IPC Classes
(74) Representative Name
(EN) Henry Goh & Co. Sdn. Bhd. : c/o AIP Law Unit Nos. 405A-410A, 4th Floor Wisma Jaya, Jalan Pemancha Bandar Seri Begawan BS8811 Brunei Darussalam
(54) Title
(EN) COMPLETION SYSTEMS AND METHODS 5 TO PERFORM COMPLETION OPERATIONS
(57) Abstract
(EN)

Completion systems and methods to perform completion operations are disclosed. A completion system includes a tubular having a wall that defines a flowbore. The completion system also includes a first port disposed in the wall and configured to provide fluid communication between the flowbore and the annular region, and a communication path disposed at least partially within the wall and configured to provide fluid communication with an annulus of a well outside of the zone. The completion system further includes a second port disposed in the wall and configured to provide fluid communication between the flowbore and the communication path, a first diverter seat disposed in the flowbore uphole of the second port and configured to receive a diverter flowing through the flowbore; and a second diverter seat disposed in the flowbore uphole of the diverter seat and configurable to receive a second diverter flowing through the flowbore.

(58) Citations
Document Type Date Action
Event NameDateStatus
Filing11.02.2020Filed
PCT National Phase Entry23.06.2022PCT National Phase
Registration29.09.2022Registered
Publication29.09.2022Published