Completion Systems and Methods to Perform Completion Operations are disclosed. A completion system includes a tubular having a wall that defines a flowbore within the tubular and extending into a zone of an annular region external to the tubular. The completion system also includes a first port disposed in the wall and configured to provide fluid communication between the flowbore and the annular region, and a communication path disposed at least partially within the wall and configured to provide fluid communication with an annulus of a well outside of the zone. The completion system further includes a second port disposed in the wall and configured to provide fluid communication between the flowbore and the communication path, a cover disposed over the second port and configured to prevent fluid communication during a fracturing operation, and a diverter seat disposed in the flowbore of the tubular uphole of the second port.